RWA.io Token Unlocks Guide

This guide outlines how to submit token allocation and emissions data under your project profile "Unlocks" tab.

1. Basic Details

Purpose: Capture core identification and reference details about the token.

Fields:

  • Networks (Required): Networks on which the token is deployed
  • Top holder list URL: Link to list of top token holders
  • Distribution Schedule URL: Link to an externally hosted distribution schedule (e.g., Notion, Google Sheet etc.)

2. Coin/Token Supply Information

Purpose: Define the creation and upper supply limits of the token.

Fields:

  • Token Generation Date (TGE) (Required): Date when the token was generated
  • Max Supply Amount (Required): Maximum number of tokens that will ever be created (if fixed)

3. Total Supply

Purpose: Capture details regarding the total token supply and its historical distribution.

Fields:

  • Total Supply Amount (Required): Total number of tokens in existence

4. Circulating Supply

Purpose: Detail how many tokens are currently in active circulation.

Fields:

  • Circulating Supply Amount (Required): Number of tokens currently in circulation
  • Vested/Locked Wallets: List of wallets where tokens are vested/locked

5. Token Unlock Schedule

Purpose: Provide data on how and when tokens are unlocked over time.

Users can upload a CSV file detailing the unlock schedule. The data will be displayed as a time series on the unlocks section of the project page.

Options:

  • Download CSV: Download template file for data upload
  • Upload CSV: Submit the template file with your data filled in

6. Initial Token Allocation

Purpose: Breakdown of how tokens are initially distributed across stakeholders.

Fields for each allocation:

  • Allocation Name (Required): e.g., Team, Investors, Ecosystem
  • Percentage of Allocation (%) (Required): Portion of total supply allocated
  • Token Generation Event Percentage (TGE %): Portion distributed at TGE
  • Cliff Period (Months) (Required): Months before tokens begin to unlock
  • Vesting Period (Months) (Required): Period over which tokens vest post-cliff
  • Release Schedule (Frequency) (Required): Description of release schedule (e.g. 15% TGE unlock, 2 months cliff, 8 months linear unlocks)

7. Submitter Information

Purpose: Identify the individual submitting the data.

Fields:

  • Role (Required): Submitter's role within the project (e.g., Founder, Developer)

8. Additional Information

Purpose: Any other relevant information not captured above.

Fields:

  • Notes: Any additional information for the RWA.io team

Important

  • All data submitted should be verifiable via on-chain data or reputable off-chain sources
  • If a field does not apply, enter "N/A" or leave it blank where appropriate
  • CSV uploads must match the required schema outlined in the downloadable template

RWA mascot otto ready to help

Need help?

Contact Us